Couldn't load pickup availability
* = £2.40 VAT | ¹ = Estimated currency conversion, you will be charged in GBP
Terminal 1 is an inactive terminal, used during the British protectorate of Zanzibar. This is a small building located on the north side of terminal 2 and currently used as an airport office. Terminal 2 is active for all landing aircraft. Construction of the third terminal started in January 2011. The new terminal was inaugurated in September 2020 and started operation in early 2021. Terminal 3 serves international flights while terminal 2 serves both domestic and some international flights.
KEY FEATURES
- Highly detailed models with high resolution textures
- Up to date runway, taxiway, apron and stands layout
- Custom and accurate taxiway signage
- Accurate terrain elevation and runway profiles
- Realistic dynamic lighting
PRODUCT GALLERY
FULL FEATURES LIST
- Highly detailed models with high resolution textures
- Up to date runway, taxiway, apron and stands layout
- Custom and accurate taxiway signage
- Accurate terrain elevation and runway profiles
- Realistic dynamic lighting